Manufacture and Supply of Electrical Equipment for the Special Gantry Crane

Project Solution:
Within the framework of the project, project documentation was prepared, necessary equipment was erected and installed. General list of equipment is the following:
- cabinet with a crane electrical equipment control system in IP55 design;
- crane control cabin;
- cable-conductor products (current lead with a flexible cable to the crane is not supplied as part of package);
- devices for working and maintenance lighting;
- loud ring;
- anemometer.
Project Setting:
Main characteristics of the crane
Lifting capacity, t | 6.3 | ||
Span, m | 16 | ||
Length of the pivot arm, m | 4.5 | ||
Lifting height, m | 9.5 | ||
Operating system | frequency | ||
Elevating speed, m/s | 0.2 | ||
Travel speed | of the crane, m/s | 0.6 | |
of the trolley, m/s | 0.6 | ||
Crane control | From the cabin | ||
Current supply | Alternate current with voltage 380V and industrial frequency 50 Hz | ||
Current lead for the crane | Cable reell | ||
Current lead for the trolley | Flexible cable with copper conductors (three phases + PE) | ||
Crane operating mode group defined by ISO 4301/1 (standard GOST 25546-82) | 5К (А5) | ||
Mechanisms operating mode group defined by ISO 4301/1: | lifting mechanism | М4 | |
trolley travel mechanism | М5 | ||
crane travel mechanism | М5 | ||
Ambient temperature specified by the manufacturer | From -40º С to +40º С | ||
Climatic modification and location category defined in the standard GOST 15150-69 | KHL1 |




2 of 5
Other projects
12 Case Technological Process Automation
Manufacture of the Germinating Chamber for Soybean

11 Case Technological Process Automation
Development of the Automated Control System for the Packed-Up Ice Cream Production Line

10 Case Technological Process Automation
Development of the Automated Control System for the Defrosting Chamber

09 Case Machinery Modification
Modification of Hydraulic-Forging Equipment for the Pressed Bricks Manufacture


07 Case Machinery Modification
Performance Restoration of the Production Line for Timber Gluing


05 Case Handling Equipment Modification
Manufacture and Supply of Electrical Equipment for an Electric Double-Girder Supported Crane

04 Case Handling Equipment Modification
Manufacture and Supply of Electrical Equipment for a General-Purpose Bridge Crane

01 Case Handling Equipment Modification
Manufacture and Supply of Electrical Equipment for the Electric Gantry Crane KK-32

2 из 5