Manufacture and Supply of Electrical Equipment for an Electric Double-Girder Supported Crane

Project Solution:
Within the framework of the project, detail design documentation was prepared and equipment was supplied in accordance with the customer requirements. The following equipment was supplied:
- control cabin, equipped with a control panel and heating devices;
- cabinet with a crane electrical equipment control system;
- cable-conductor products of the crane (current lead cable for the trolley, harnesses for bridge, trolley and cabin);
- devices for working and maintenance lighting;
- loud ring;
- limit switches;
- metal hose with joints, metal box for wiring on the crane bridge;
- terminal boxes;
- crane capacity limiter (CCP) with parameter registration function.
Project Setting:
Main characteristics of the crane
Lifting capacity, t | 12.5 | |
Span, m | 20 | |
Lifting height, m | 6 | |
Elevating speed, m/s | 0.16 | |
Travel speed | of the crane, m/s | 1.0 |
of the trolley, m/s | 0.6 | |
Crane control | From the cabin | |
Current type and Voltage | Alternate current, 380 V | |
Current lead for the crane | Trolley feeding | |
Current lead for the trolley | Flexible cable with copper conductors fixed on carriages moving along a rigid rack | |
Crane operating mode group defined by ISO 4301/1 (GOST 25546-82) | А5 | |
Mechanisms operating mode group defined by ISO 4301/1: | lifting mechanism | М6 |
trolley travel mechanism | М6 | |
crane travel mechanism | М6 | |
Weight of the crane, t | 17.5 | |
Crane rail type | R-50 | |
Ambient temperature specified by the manufacturer | From -20º С to +40º С | |
Climatic modification and location category defined in the standard GOST 15150-69 | U 4 | |
Seismic rating | Rate 6 |






2 of 5
Other projects
12 Case Technological Process Automation
Manufacture of the Germinating Chamber for Soybean

11 Case Technological Process Automation
Development of the Automated Control System for the Packed-Up Ice Cream Production Line

10 Case Technological Process Automation
Development of the Automated Control System for the Defrosting Chamber

09 Case Machinery Modification
Modification of Hydraulic-Forging Equipment for the Pressed Bricks Manufacture


07 Case Machinery Modification
Performance Restoration of the Production Line for Timber Gluing


04 Case Handling Equipment Modification
Manufacture and Supply of Electrical Equipment for a General-Purpose Bridge Crane

03 Case Handling Equipment Modification
Manufacture and Supply of Electrical Equipment for the Special Gantry Crane

01 Case Handling Equipment Modification
Manufacture and Supply of Electrical Equipment for the Electric Gantry Crane KK-32

2 из 5